Instrument Engineer
Qarshi, Qashqadaryo
(0)

Social


About Md “Shahid” Rahman:

Instrumentation professional with 17 + years of experience in on Construction, Pre-commissioning, Commissioning, Start-up and Maintenance of Oil and Gas Plants. Experience on DCS, ESD, PLC, SCADA, Electronic and Pneumatic instrumentation & Controls. Seeking a position as Instrument Engineer/ Supervisor in your estimated organization. Utilizing my experience, analytical skills and technical knowledge to support and enhance efficiency for your organization.

Experience

  • Resolved the Engineering issues related to Instruments on construction site
  • Supervised the construction activities e.g. Panels Installation, Instrument Installation, Cabling, Termination and Trenching.
  • Supervised the pre commissioning activities e.g. Continuity, Loop check, Calibration and Function testing.
  • Good knowledge with WorleyParsons construction management tool (CMT). Good knowledge in Aramco Standard, Exxon Mobil Global practice, NFPA 70, NEC, IEC, IEEE, NEMA and NETA - ATS.
  • To ensure that all documentation is furnished such as P&ID’s, Cause & effect, Logic diagram, interlock narrative, IPS interlock description, sequence details, data sheets, ESD schematics, hook-up, wiring diagrams.
  • Coordinate and Ensuring that all Fire & Gas commissioning procedures and paperwork is completed to enable a smooth hand over of systems to Operations.
  • Experience in SRV, GCV and IGV Calibration Expertise in Burner management system for both oil and gas fired boiler.

Education

COMPANY                                                  :               Enter Engineering Pte.Ltd.

Project                                                          :               GTL Project- Uzbekistan

Position                                                        :               Instrument Engineer

Date                                                               :               Jan.2018 to till Continue 

Responsibilities

  • Resolved the Engineering issues related to Instruments on construction site
  • Supervised the construction activities e.g. Panels Installation, Instrument Installation, Cabling, Termination and Trenching.
  • Supervised the pre commissioning activities e.g. Continuity, Loop check, Calibration and Function testing.
  • Knowledge of hazardous area classifications and equipment, to include maintenance and repair
  • Reconciliation of the Instruments, materials of the entire project.
  • Conversant with Process Industry Practices, Engineering Codes and Standards such ISA, IEC, API, etc. relevant to Instrumentation discipline.
  • Participation in Project review meetings, key document reviews, model reviews, close out of punch items etc.

COMPANY                                                  :               DOOSAN HEAVY INDUSTRY 

Project                                                          :               AL- Ansab STP Phase II-OMAN 

Position                                                        :               INSTRUMENT ENGINEER

Date                                                               :               April.2015 to July15 2018

Responsibilities

  • Check and supervise that the work is performed in compliance with the contract specifications, schedule and assess any deviations requested by the contractor before transmitting it to the Construction Site,
  • Review of PID, Instrument Plot plan, cable tray layout review, Hook Up, instrument loop drawing etc.
  • To ensure that the project activities are carried out as per the quality plan.

COMPANY                                                  :               Worley Parsons 

Project                                                          :               Wafra Joint Operation - Kuwait

Position                                                        :               DCS Specialist Engineer

Date                                                               :               Oct.2013 to Jan.2015

Responsibilities

  • Reviews P & ID’s and ensures logic is aligned with Process Objectives and HAZOP recommendations, 
  • Coordinates closely with process Engineers and Operations and maintenance staff to ensure correct control logic
  • Reviews and communicate progress and performance status
  • Maintain interface with Operations, Maintenance, and Reliability (from design stand point).
  • Obtains and incorporates all applicable input into the design.
  • Accountable / responsible for quality of work for the whole project.
  • Develops and inputs of applicable Project Execution Plans.

COMPANY                                                  :               TOTAL E&P YEMEN

Project                                                          :               KPP Block 10, CPU, CCU 

Position                                                        :               Instrumentation & Control Supervisor

Date                                                               :               Feb. 2012 to Aug.2013

Responsibilities 

  • Engaged on a 28/28-day rotation rresponsible for looking activity done by EPC contractors as per TOTAL Specifications 
  • Witness of ICAPS test and Authorize to sign ICAPS form for pre-commissioning and final commissioning of the systems with complete loop check, 
  • Handling of the site engineering issues with corrective action. 
  • Witness all kind of inspection for construction, pre-com and final commissioning 
  • Testing and Commissioning of Fiber optic network Cable.
  • Responsible for loop checking from field, from RTU Marshalling, SCADA HMI
  • To witness routine and functional test during SAT for PAGA System
  • Ensure that the Instrument pre-commissioning and commissioning spare parts, consumables equipment, special tools, etc are available in time.

Company                                                     :               Worley Parsons Saudi Arabia Ltd.

Project                                                          :               SAMREF Clean Fuel Project

Client                                                            :               SAMREF

Position                                                        :               Instrument Engineer

Date                                                               :               Nov. 2010 to Feb. 2012

Responsibilities

  • Responsible for Site Acceptance Testing of all Fire & Gas detectors
  •  Ensure all team members are fully aware and understand all safe working practices and maintain a Safe working environment.
  • Ensuring the technical integrity of F&G systems prior to acceptance of ‘Mechanical Completion’ certificates from the construction contractor / Sub -Contractor.
  • Update all mark-up drawing to document control team / Engineering management team for As Build documents.
  • Responsible for Site Acceptance Testing of all Fire & Gas detectors
  •  Ensure all team members are fully aware and understand all safe working practices and maintain a Safe working environment.
  •  Ensuring the technical integrity of F&G systems prior to acceptance of ‘Mechanical Completion’ certificates from the construction contractor / Sub -Contractor.
  •  Update all markup drawing to document control team / Engineering management team for As Build documents.

Company                                                     :               CTJV –Chiyoda Technip Joint Venture 

Project                                                          :               RGX Train 6/7 & QCS Train 6/7 LNG Project Qatar

Position                                                        :               Instrument Loop check Supervisor-PMC

Date                                                               :               Oct.2008 to July to 2010

Scope of works (SOW)

The Company first in a new generation of LNG Mega-Trains, each capable producing 7.8 MTA of LNG. Ras Gas Train 6 produced its first LNG in July 2009. The following month its first cargo, a 212,000m3 shipment of LNG, was loaded aboard the Ras Gas Q-Flex tanker Al Utouriya. The new train was formally inaugurated in October 2009. The start-up of Train 6 boosted Ras Gas’ LNG production capacity to 28.5 Mta.

Responsibilities

  • Involved in SATs of DCS, ESD, F & G, CMS, Analyzer Houses and other Vendor Package Skids
  • To carry out Instrument Loop checking, Functional testing, Calibration & Stroke check of all Field bus Control valves & Hart type SDV, ESDV, MOV valves & RCS ESDV system & its functionality
  • Commissioned the Train 2 comprises of 40MW GTGs & HRSG, Air Compressors, Nitrogen Package, Fuel Gas Skids, Off Gas Compressor, Boilers and Flare, Condensate Degassing System, Pump motors and Fan Motors, 