Instrumentation professional with 17 + years of experience in on Construction, Pre-commissioning, Commissioning, Start-up and Maintenance of Oil and Gas Plants. Experience on DCS, ESD, PLC, SCADA, Electronic and Pneumatic instrumentation & Controls. Seeking a position as Instrument Engineer/ Supervisor in your estimated organization. Utilizing my experience, analytical skills and technical knowledge to support and enhance efficiency for your organization.
Experience
- Resolved the Engineering issues related to Instruments on construction site
- Supervised the construction activities e.g. Panels Installation, Instrument Installation, Cabling, Termination and Trenching.
- Supervised the pre commissioning activities e.g. Continuity, Loop check, Calibration and Function testing.
- Good knowledge with WorleyParsons construction management tool (CMT). Good knowledge in Aramco Standard, Exxon Mobil Global practice, NFPA 70, NEC, IEC, IEEE, NEMA and NETA - ATS.
- To ensure that all documentation is furnished such as P&ID’s, Cause & effect, Logic diagram, interlock narrative, IPS interlock description, sequence details, data sheets, ESD schematics, hook-up, wiring diagrams.
- Coordinate and Ensuring that all Fire & Gas commissioning procedures and paperwork is completed to enable a smooth hand over of systems to Operations.
- Experience in SRV, GCV and IGV Calibration Expertise in Burner management system for both oil and gas fired boiler.
Education
COMPANY : Enter Engineering Pte.Ltd.
Project : GTL Project- Uzbekistan
Position : Instrument Engineer
Date : Jan.2018 to till Continue
Responsibilities
- Resolved the Engineering issues related to Instruments on construction site
- Supervised the construction activities e.g. Panels Installation, Instrument Installation, Cabling, Termination and Trenching.
- Supervised the pre commissioning activities e.g. Continuity, Loop check, Calibration and Function testing.
- Knowledge of hazardous area classifications and equipment, to include maintenance and repair
- Reconciliation of the Instruments, materials of the entire project.
- Conversant with Process Industry Practices, Engineering Codes and Standards such ISA, IEC, API, etc. relevant to Instrumentation discipline.
- Participation in Project review meetings, key document reviews, model reviews, close out of punch items etc.
COMPANY : DOOSAN HEAVY INDUSTRY
Project : AL- Ansab STP Phase II-OMAN
Position : INSTRUMENT ENGINEER
Date : April.2015 to July15 2018
Responsibilities
- Check and supervise that the work is performed in compliance with the contract specifications, schedule and assess any deviations requested by the contractor before transmitting it to the Construction Site,
- Review of PID, Instrument Plot plan, cable tray layout review, Hook Up, instrument loop drawing etc.
- To ensure that the project activities are carried out as per the quality plan.
COMPANY : Worley Parsons
Project : Wafra Joint Operation - Kuwait
Position : DCS Specialist Engineer
Date : Oct.2013 to Jan.2015
Responsibilities
- Reviews P & ID’s and ensures logic is aligned with Process Objectives and HAZOP recommendations,
- Coordinates closely with process Engineers and Operations and maintenance staff to ensure correct control logic
- Reviews and communicate progress and performance status
- Maintain interface with Operations, Maintenance, and Reliability (from design stand point).
- Obtains and incorporates all applicable input into the design.
- Accountable / responsible for quality of work for the whole project.
- Develops and inputs of applicable Project Execution Plans.
COMPANY : TOTAL E&P YEMEN
Project : KPP Block 10, CPU, CCU
Position : Instrumentation & Control Supervisor
Date : Feb. 2012 to Aug.2013
Responsibilities
- Engaged on a 28/28-day rotation rresponsible for looking activity done by EPC contractors as per TOTAL Specifications
- Witness of ICAPS test and Authorize to sign ICAPS form for pre-commissioning and final commissioning of the systems with complete loop check,
- Handling of the site engineering issues with corrective action.
- Witness all kind of inspection for construction, pre-com and final commissioning
- Testing and Commissioning of Fiber optic network Cable.
- Responsible for loop checking from field, from RTU Marshalling, SCADA HMI
- To witness routine and functional test during SAT for PAGA System
- Ensure that the Instrument pre-commissioning and commissioning spare parts, consumables equipment, special tools, etc are available in time.
Company : Worley Parsons Saudi Arabia Ltd.
Project : SAMREF Clean Fuel Project
Client : SAMREF
Position : Instrument Engineer
Date : Nov. 2010 to Feb. 2012
Responsibilities
- Responsible for Site Acceptance Testing of all Fire & Gas detectors
- Ensure all team members are fully aware and understand all safe working practices and maintain a Safe working environment.
- Ensuring the technical integrity of F&G systems prior to acceptance of ‘Mechanical Completion’ certificates from the construction contractor / Sub -Contractor.
- Update all mark-up drawing to document control team / Engineering management team for As Build documents.
- Responsible for Site Acceptance Testing of all Fire & Gas detectors
- Ensure all team members are fully aware and understand all safe working practices and maintain a Safe working environment.
- Ensuring the technical integrity of F&G systems prior to acceptance of ‘Mechanical Completion’ certificates from the construction contractor / Sub -Contractor.
- Update all markup drawing to document control team / Engineering management team for As Build documents.
Company : CTJV –Chiyoda Technip Joint Venture
Project : RGX Train 6/7 & QCS Train 6/7 LNG Project Qatar
Position : Instrument Loop check Supervisor-PMC
Date : Oct.2008 to July to 2010
Scope of works (SOW)
The Company first in a new generation of LNG Mega-Trains, each capable producing 7.8 MTA of LNG. Ras Gas Train 6 produced its first LNG in July 2009. The following month its first cargo, a 212,000m3 shipment of LNG, was loaded aboard the Ras Gas Q-Flex tanker Al Utouriya. The new train was formally inaugurated in October 2009. The start-up of Train 6 boosted Ras Gas’ LNG production capacity to 28.5 Mta.
Responsibilities
- Involved in SATs of DCS, ESD, F & G, CMS, Analyzer Houses and other Vendor Package Skids
- To carry out Instrument Loop checking, Functional testing, Calibration & Stroke check of all Field bus Control valves & Hart type SDV, ESDV, MOV valves & RCS ESDV system & its functionality
- Commissioned the Train 2 comprises of 40MW GTGs & HRSG, Air Compressors, Nitrogen Package, Fuel Gas Skids, Off Gas Compressor, Boilers and Flare, Condensate Degassing System, Pump motors and Fan Motors,